Construction, Permitting & Monitoring
Mill River Dam Removals, Analysis, Design & Construction
A google earth image shows the Hopewell Mills site in 2012 before the impoundment (at lower right of photo) was drained.
Horsetail Creek Floodplain Reconnection
Project goals included reducing thermal loading from the gravel borrow pond, and enhancing floodplain habitat quality and access for ESA-listed salmonid juveniles.
Sheridan Park/Mississippi Riverfront Bank Stabilization
Inter-Fluve was hired to restore eroding streambank to save monument cottonwood trees.
Horsetail Creek Floodplain Reconnection
Project goals included reducing thermal loading from the gravel borrow pond, and enhancing floodplain habitat quality and access for ESA-listed salmonid juveniles.
Sand Creek Fluvial Geomorphic Assessment & Watershed Restoration Plan
We conducted an watershed-level assessment of the Sand Creek and Credit River watersheds to identify areas of concern and prioritize restoration projects.
Mill River Dam Removals, Analysis, Design & Construction
A google earth image shows the Hopewell Mills site in 2012 before the impoundment (at lower right of photo) was drained.
Horsetail Creek Floodplain Reconnection
Project goals included reducing thermal loading from the gravel borrow pond, and enhancing floodplain habitat quality and access for ESA-listed salmonid juveniles.
Sheridan Park/Mississippi Riverfront Bank Stabilization
Inter-Fluve was hired to restore eroding streambank to save monument cottonwood trees.